Specific rescue technology

For the purpose of rapid and secure evacuation of all persons on high structures the CTE-system has been developed. Increased

efficiency and higher performance lead to ever more powerful windturbine systems in the multi-megawatt class. The process of

re-powering works as an additional catalyst for this trend causing faster increase in the number of installations on which several

people are present at the same time. Should situations of extreme danger (for instance fire in the nacelle) requiring immediate

evacuation occur, traditional rescue procedures and rescue equipment can create a dangerous bottleneck.

The alternative is provided by the Collective Tower Evacuation System

®

 (CTE-System) which has been developed especially

to eliminate these bottlenecks.The patented CTE-System assures the fastest possible evacuation/rescue of all persons from the

dangerzone.

Adaption to customer requirements and specific features of the target environment The CTE-System will be designed, build and installed in accordance with the installation environment in vertical or horizontal version. For the windpower industry the CTE-System will be adapted to the lay-out of the individual nacelle design as well as the customer requirements. We offer the possibility to adept the CTE-System in the design phase of the windpower system eliminating later problems of integration of existing systems and giving our clients the possibility to offer their systems: RESCUE INCLUSIVE! SHE Solution and partnes are alwayse available for the consultation on the possibilities of the CTE-System

© 2017

SHE Solution GmbH & Co. KG           Im Sundernkamp 2, 32130 Enger, Germany +49 (0) 5224 9393 850 Fax +49 (0) 5224 9393 852 info(at)she-solution.de http://www.she-solution.de
Tested and approved according  EN 341:2011/1D meets the requirements of EN50308 automatic controlled descend speed from 0,8m/s  to 1,2m/s max. descend high 200m  max. descend load 200kg for each unit (1 unit = 1 person) easy and simple to handle fastest pssible evacuation of large groups of persons (6 persons per minute) fireproof low maintenance   The vertical version is the optimized rescue solution for manufacturer defined wind power installations the CTE-System can grow with the towerhight the CTE-System can grow with the number of persons The horitzonal version (upto 30 degrees) has been designed for construction, drilling rigs etc.
FACT SHEET FACT SHEET
New version!

                  Specific rescue technology

For the purpose of rapid and secure evacuation of all persons

on high structures the CTE-system has been developed.

Increased efficiency and higher performance lead to ever more

powerful windturbine systems in the multi-megawatt class. The

process of re-powering works as an additional catalyst for this

trend causing faster increase in the number of installations on

which several people are present at the same time. Should

situations of extreme danger (for instance fire in the nacelle)

requiring immediate evacuation occur, traditional rescue

procedures and rescue equipment can create a dangerous

bottleneck.

The alternative is provided by the Collective Tower

Evacuation System

®

 (CTE-System) which has been

developed especially to eliminate these bottlenecks.The

patented CTE-System assures the fastest possible

evacuation/rescue of all persons from the dangerzone.

Adaption to customer requirements and specific features of the target environment The CTE-System will be designed, build and installed in accordance with the installation environment in vertical or horizontal version. For the windpower industry the CTE- System will be adapted to the lay-out of the individual nacelle design as well as the customer requirements. We offer the possibility to adept the CTE-System in the design phase of the windpower system eliminating later problems of integration of existing systems and giving our clients the possibility to offer their systems: RESCUE INCLUSIVE! SHE Solution and partnes are alwayse available for the consultation on the possibilities of the CTE-System

© 2017

SHE Solution GmbH & Co. KG           Im Sundernkamp 2, 32130 Enger, Germany +49 (0) 5224 9393 850 Fax +49 (0) 5224 9393 852 info(at)she-solution.de http://www.she-solution.de
Prüfung und Zulassung nach EN 341:2011/1D meets the requirements of EN50308 automatic controlled descend speed from 0,8m/s  to 1,2m/s max. descend high 200m max. descend load 200kg for each unit (1 unit = 1 person) easy and simple to handle fastest pssible evacuation of large groups of persons (6 persons per minute) fireproof low maintenance The vertical version is the optimized rescue solution for manufacturer defined wind power installations: the CTE-System can grow with the towerhight. the CTE-System can grow with the number of persons. The horzontal version ( upto 30 degrees) has been designed for construction, drilling rigs etc.
FACT SHEET FACT SHEET
New version!